Requirement library

Seed catalogue for the Stage 1 prototype; the full library expands to 120–180 requirements.
Signed in as No role assigned

Catalogue

23 requirements

CodeQuestionDomainGateCriticalityExpected evidence
OSS-GOV-001Is a commissioning management plan approved and under revision control?GovernanceG0HighApproved commissioning management plan with signature and revision record.
OSS-GOV-002Are commissioning authorities, RASCI and escalation routes formally appointed?GovernanceG0MediumAppointment letters, RASCI matrix and organisation chart.
OSS-SYS-001Is the system breakdown structure defined with testable commissioning boundaries?SystemisationG1HighApproved SBS, boundary drawings and tagging convention.
OSS-ENG-001Are single-line diagrams and protection philosophy issued as approved for construction?Engineering maturityG1Gate-criticalAFC drawing register extract and TQ closure log.
OSS-ENG-002Are earthing, bonding and lightning protection calculations approved?Engineering maturityG1HighApproved calculation report and as-designed earthing layout.
OSS-ENG-003Are protection settings calculated, approved and issued to site for the energisation boundary?Engineering maturityG5Gate-criticalApproved settings calculation, settings file and relay firmware register.
OSS-DOC-001Is a controlled document register available with revision status for all commissioning documents?DocumentationG1MediumDMS register export with cut-off date.
OSS-DOC-002Are vendor FAT reports and certificates received and reviewed for installed equipment?DocumentationG3HighFAT reports, certificate index and serial-number traceability list.
OSS-PRC-001Are SAT and SIT procedures approved with quantified acceptance criteria?ProceduresG2Gate-criticalApproved SAT/SIT procedures with review comments closed.
OSS-PRC-002Is an approved energisation procedure available with defined switching steps and boundaries?ProceduresG5Gate-criticalApproved energisation procedure, switching schedule and boundary marked-up SLD.
OSS-PLN-001Does the commissioning schedule show logic, dependencies and offshore access windows?PlanningG2MediumSchedule extract with logic and access windows.
OSS-CON-001Is mechanical completion evidence available for the subsystem with punch status categorised?Construction completionG3Gate-criticalMC certificates and categorised punch register.
OSS-CON-002Are cable installation and termination records complete for the subsystem?Construction completionG3HighCable schedule with test records and termination sign-off.
OSS-TST-001Are calibrated test tools and competent resources available?Test readinessG4HighCalibration, mobilisation and competence evidence.
OSS-TST-002Are test prerequisites and hold points agreed and signed by all parties?Test readinessG4Gate-criticalSigned prerequisite checklist and witness/hold-point matrix.
OSS-SAF-001Are electrical safety rules, PTW and LOTO implemented and appointments issued?Electrical safetyG5Gate-criticalSafety rules document, PTW audit record and signed appointment register.
OSS-SAF-002Is the interlocking scheme proven against the approved energisation boundary?Electrical safetyG5Gate-criticalInterlocking proving test record signed by the HV Authorised Person.
OSS-INT-001Are interfaces to the export cable, onshore substation and TSO defined and agreed?InterfacesG4HighSigned interface register and interface control documents.
OSS-INT-002Is the SCADA signal list verified end to end to the onshore control centre?InterfacesG6Gate-criticalSigned signal list with point-to-point verification results.
OSS-HSE-001Are SIMOPS controls and emergency response arrangements agreed for the commissioning phase?HSE and SIMOPSG4HighSIMOPS matrix, ERP and exercise record.
OSS-QUA-001Are ITPs, NCRs and deviations current with no open safety-related non-conformances?QualityG3MediumITP status report and NCR/deviation register.
OSS-HND-001Are as-built records, asset data, spares and operator training ready for acceptance?HandoverG7HighAs-built register, asset data load confirmation, spares receipt and training records.
OSS-ITO-001Is OT network segregation implemented and remote access controlled?Engineering maturityG6HighNetwork architecture as-built, access control policy and hardening report.

Project overlays

Projects tailor the master library through overlays; the master requirement itself is never edited.

ProjectRequirementApplicabilityReasonJustification
NVW-OSS-01OSS-HND-001ApplicableClient training strategy agreed at PEM-14; master requirement unchanged.
NVW-OSS-01OSS-ITO-001Not applicableScope carve-out confirmed in writing; master requirement remains unchanged in library v1.0.OT segregation for OSS Alpha is delivered and assured under the Nordvind fleet-wide cyber programme, assessed separately under contract NVW-CYB-03. Confirmed by IME Reviewer on 2026-08-11.